- Usage Purpose: Mass Housing and Social Facility Units
- Building Model: Prefabricated Ready Housing
- Number of Buildings: 900 Units
- Total Area: 158,256 m²
- Project Year: 2014
- Location: Baghdad and Kut, Iraq
- Completion Time: 7 months
WHO BENEFITED FROM THIS PROJECT AND HOW?
Iraqi Central Government
Thanks to this rapidly implemented project in the post-war period, the housing needs of people were met, the transition to normal life was supported, and social stability was restored.
Iraqi People
The Iraqi population, struggling to survive under harsh conditions, gained healthy, safe, and permanent living spaces through this project, contributing to both physical and psychological recovery.
Why Is This Project Inspiring for You / What Can We Do for You?
We design and manufacture modular structures tailored to the specific geography and climate conditions of each project. Offering customizable, quickly installable, and long-lasting solutions, Karmod brings your projects to life with a wide range of structures—from housing and office spaces to social facilities and temporary accommodations.
- Climate configurations specific to each country
- Modular, portable, and durable structures
- Fast production & installation – no time wasted
- Turnkey solutions
- 0135 years of export experience
- 02Deliveries and customs knowledge for 130 countries
- 03ISO-certified production and post-sales quality control
- 04Single point of contact throughout the project
Let's Discuss Your Project
If you are looking for structures that are quickly producible, durable, long-lasting, and cost-effective, Karmod is the right choice for you. All you need to do is communicate your needs to us. We provide the most suitable solutions tailored to you, contributing to your project in the fastest and most reliable way.
How many houses were produced in this project?A total of 900 structures were produced in this project, meaning a house was built for 900 families.
How long did the project take?The construction of the project took a total of 7 months.
Can the structures be used in arid regions?When producing the buildings, we configure them according to the geography and climate conditions of the installation area.
What type of structures were used in the project?The structure type used in the project is prefabricated ready housing.
How many stories were the houses?Each building was produced as a two-story structure.